Cleaning unit (as part of an assembly of reception, cleaning, drying and storage of grain to process 40,000 tons) Manufacture and installation of metal structures of the bridge pedestrian crossing on the M06 Kyiv-Chop highway of international importance Production and installation of metal structures of a frame of a summer theater, the width of the trusses of the main frame is 36 m with a total bearing load of 100 tons, 3rd degree of complexity, 5th degree of danger Road structures to fix route guidance signs Metal structures of the exhaust filter for the workshop of metal structures hot galvanizing Metal structures of the exhaust filter for the workshop of metal structures hot galvanizing Works on basements/building foundations